DB board upgrades in Kempton Park — what we actually find
The practical obstacle on a Kempton Park board is space: they are commonly full, with no spare way for the dedicated circuits a certificate now requires. Where the property runs as a guesthouse or short-let near OR Tambo, the compliance requirements differ from a domestic installation altogether, and we assess against the correct one before specifying the board.
Property stock in Kempton Park
Kempton Park's 1970s and 1980s freehold homes are at the age where original galvanised supply pipe fails from the inside out, so pressure drops gradually rather than bursting and owners tend to blame the geyser. Proximity to OR Tambo means many properties run guesthouse or short-let operations from converted homes, which carries different compliance requirements from a domestic installation.
Direct access. On guesthouse and short-let properties we schedule around occupancy and assess against the compliance standard that fits the actual use.
Faults that cluster in Kempton Park
- Galvanised supply pipe failing from the inside out, read as a weak geyser
- Guesthouse and short-let use assessed against domestic rather than the correct standard
- Full boards with no spare way for the dedicated circuits a COC now requires
- Flow restriction between geyser outlet and tap rather than a cylinder fault
How DB board upgrades works
A distribution board needs upgrading if it is more than about twenty-five years old, still uses re-wireable fuses, has no earth leakage protection, or predates current SANS 10142 layout requirements. It is also effectively a prerequisite for solar, an EV charger or any significant renovation, because the new work has to be certified and an old board will not support it. A board that buzzes or smells hot is not a scheduling matter — that is how board fires start.
- Full board replacement to current SANS 10142 requirements
- Earth leakage protection where none is fitted, and correct circuit separation
- Surge arrester installation, which matters on the Highveld more than most places
- Load surveys before adding solar, an EV charger or renovation circuits
- Electrical COC issued in the registered person's own name on completion
Our process on a Kempton Park call-out
- 1Inspect the existing board, its protection devices and the circuit layout
- 2Measure actual load per circuit rather than assuming the original design still fits
- 3Quote the board, protection, surge arrester and certification as itemised work
- 4Replace and re-terminate, torque-checking every connection
- 5Test each circuit and issue the Electrical COC
DB board upgrades in Kempton Park — frequently asked questions
Other work we do in Kempton Park
Need DB board upgrades in Kempton Park?
Owner-managed by Garth Blair. We pick up the phone and book you in personally.
Speak to Garth directly.
Owner-managed means you reach the person who's accountable. Phone, email or WhatsApp — whatever's easiest for you.
- Call now082 886 9119
- WhatsApp082 886 9119
- Emailgarth@appleplumbing.co.za
- Service areaSandton, Midrand & Northern JHB
- HoursMonday to Saturday, 07:00 – 17:00