24/7 EmergencySandton · Midrand
    Backup Power

    Inverter Installations for Load Shedding

    Keep your lights, Wi-Fi, fridge and TV running through load shedding with a properly sized inverter and battery.

    Load shedding hasn't gone away — it's just intermittent. A well-sized inverter and battery system keeps your essential loads running through stages 1–6 with no audible generator, no fuel, and PV-ready for future solar. We size to actual measured load — not the marketing spec sheet.

    What we do

    Energy audit, inverter and battery sizing, essential-loads board install, inverter and battery mounting and connection, monitoring setup.

    Inverter sizing guide

    Match the inverter and battery to what you need to run.

    SystemRunsTypical battery
    3kVALights, Wi-Fi, TV, fridge5kWh
    5kVAAbove + microwave/pump5–10kWh
    8kVA+Near whole-home (with solar)10kWh+

    Our process

    1. 1Energy audit of your essential loads
    2. 2Inverter and battery sizing
    3. 3Essential-loads board wiring
    4. 4Install and commission
    5. 5Monitoring app setup

    Pricing

    5kVA inverter + 5kWh battery, essential loads switched, installed: from R75,000. PV-ready.

    Prices are indicative for Northern Johannesburg, 2026. Every job is quoted in writing on site before work proceeds.

    Why choose Apple Plumbing & Electrical

    Sized to your actual load — measured, not guessed.

    Frequently asked questions

    Need Backup Power in Northern Joburg?

    Owner-managed by Garth Blair. We pick up the phone and book you in personally.

    Get in touch

    Speak to Garth directly.

    Owner-managed means you reach the person who's accountable. Phone, email or WhatsApp — whatever's easiest for you.

    Request a Free Quote

    We'll get back to you within one business day.

    This opens your own email app with the details filled in — press send there to reach us.

    Or call directly: 082 886 9119